Enlarge image
Image 1 of 6
Two-Component Epoxy Zinc-Rich Primer
Two-component epoxy primer for steel substrates.
Reference price (FOB)
US $3.5-4 / kg
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuotePerformance
- Main Raw Material
- Epoxy
- Level
- Primer
- Components
- Film-forming material
- Film-forming mechanism
- Conversion Type
- Luster
- Matt
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24 h, Fully cured 7 days
- Coating thickness
- Wet film:80um Dry film: 40um
Application
- Method
- Spray
- Drying Method
- Air Drying
- Substrate
- Steel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Roller
- Mixing ratio
- 10:1
- Construction method
- High pressure airless spray, air spray, Brush, Roller
Packaging
- Weight
- 20 kg/Barrel
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000 kg
- Shelf life
- 12 months
Product description
Product Description
Product Name: Anti-Rust Epoxy Zinc Primer Anti Corrosion Coating for Industrial Steel Protection
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24 h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction method | High pressure airless spray, air spray, Brush, Roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3. Construction conditions:
The substrate temperature must be 3°C higher than the dew point, relative humidity <85%, wind force ≤ level 3; when the substrate temperature is lower than 5°C, the epoxy resin and curing agent stop reacting and construction should be stopped. Avoid rainy, foggy, windy and sandy days and condensation in the morning and evening for outdoor construction.
4. Notes:
1. Before use, use mechanical stirring to mix component A evenly, and then mix it evenly with component B.
2. Regularly stir during the coating process to prevent sedimentation, which can cause an imbalance in the powder to liquid ratio and affect the quality of the paint film.
3. It is recommended that the dry film thickness be ≥70μm, and 1 to 2 coats be completed.
4. After mixing, the two-component paint is generally used up within 5 hours. Exceeding the time may affect the coating quality.
5. After the curing agent is used up, it must be covered tightly and used up as soon as possible to prevent losses caused by reactions with water vapor in the air.
Supplier information
- Trademark
- SINGAL
- Origin
- Dongying China
- HS Code
- 3208100000
Discuss this product for your project
Include your application, required quantity and destination.
