Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Barrel of Dual Component Epoxy Coating
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be expertly shot or sand-blasted to achieve Sa2.5 level, or carefully rust-removed to St3 level for premium results.
3.Construction conditions:
Make sure the substrate temperature is at least 3°C higher than the dew point, with relative humidity below 85%, and wind force not exceeding level 3. Should the substrate temperature drop below 5°C, the epoxy resin and curing agent cease reacting, necessitating a halt in construction. Refrain from working in rainy, foggy, windy, or sandy conditions, as well as in times of morning or evening condensation for optimum results.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then blend it evenly with component B to ensure uniformity.
2. Maintain regular stirring during the coating process to prevent sedimentation, which can disrupt the delicate powder to liquid balance and impair the quality of the paint film.
3. For best outcomes, aim for a dry film thickness of at least 70μm, applying 1 to 2 coats.
4. Once mixed, ensure the two-component paint is utilized within 5 hours, as exceeding this timeframe can compromise coating quality.
5. After using the curing agent, promptly seal it tightly to prevent loss due to reactions with ambient water vapor. Use it as quickly as possible.
Discuss this product for your project
Include your application, required quantity and destination.
