Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Epoxy Zinc Rich Primer Paint for Airless Spray Applications
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
Achieve optimal performance by shot blasting or sandblasting the steel surface to Sa2.5 level, or manually removing rust to St3 level.
3. Construction conditions:
Ensure the substrate temperature is 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, halting construction. Avoid outdoor activities during rainy, foggy, windy, or sandy weather, and during morning and evening condensation.
4. Notes:
1. Prior to use, employ mechanical stirring to thoroughly mix component A, then blend evenly with component B.
2. Maintain consistent stirring throughout the coating process to avert sedimentation, which may disrupt the powder-to-liquid ratio and compromise paint film quality.
3. For best results, a dry film thickness of at least 70μm is recommended, with 1 to 2 coats completed.
4. Post-mixing, utilize the two-component paint within 5 hours to maintain coating quality. Exceeding this timeframe may deteriorate the finish.
5. After using the curing agent, tightly cover it and use promptly to avoid losses from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
