Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Epoxy Zinc Rich Primer Paint for Brush and Roller Applications
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is expertly prepared using shot blasting or sand blasting to achieve a pristine Sa2.5 level of cleanliness, or it is meticulously cleaned to a St3 level manually to ensure optimal paint adhesion.
3. Construction conditions:
The substrate temperature must be at least 3°C above the dew point to prevent moisture issues. Maintain a relative humidity below 85% and ensure wind forces do not exceed level 3. If the substrate temperature drops below 5°C, the reaction between the epoxy resin and curing agent halts, necessitating a pause in construction. For outdoor applications, avoid days with rain, fog, strong winds, or sandy conditions, and steer clear of times prone to morning and evening condensation.
4. Notes:
1. Before use, employ mechanical stirring to thoroughly homogenize component A, and subsequently blend it meticulously with component B to ensure uniformity.
2. Continually stir during application to avert sedimentation, which might disrupt the powder-to-liquid ratio and compromise the integrity of the paint film.
3. It is advisable to aim for a dry film thickness of at least 70μm, completing 1 to 2 coats for optimal performance.
4. Once mixed, utilize the two-component paint within 5 hours to maintain coating quality, as exceeding this timeframe may lead to adverse effects.
5. Seal the curing agent tightly after use and employ it promptly, guarding against potential reactions with ambient water vapor that could lead to wastage.
Discuss this product for your project
Include your application, required quantity and destination.
