Model: FD-H001

FD-H001 20kg Matt Epoxy Paint Primer for All Your Projects

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, enhanced with phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It isingeniously packed by dual componentsAand B.Characteristics:Highshielding property, exhibiting superioranti-rustcapability, strongadhesion, and exceptional oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level, ensuring perfection.

3.Construction conditions:
The substrate temperature must surpass the dew point by 3°C, with relative humidity under 85%, and wind force no greater than level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent cease to react, halting construction. Avoid outdoor applications on rainy, foggy, windy, or sandy days, and during morning or evening condensation.

4.Notes:
1. Prior to use, expertly stir component A with mechanical vigor, then blend it seamlessly with component B.
2. Ensure regular stirring during the coating process to prevent sedimentation, which can disrupt the powder to liquid ratio and compromise the paint film's quality.
3. Recommended dry film thickness is ≥70μm, with 1 to 2 coats for optimal results.
4. The two-component paint should ideally be used within 5 hours post-mixing to maintain coating integrity.
5. After the curing agent is used, seal tightly and use promptly to avoid loss from reactions with atmospheric moisture.

FD-H001 20kg Matt Epoxy Paint Primer for All Your Projects
FD-H001 20kg Matt Epoxy Paint Primer for All Your Projects

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote