Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 20kg Matt Epoxy Zinc Rich Primer Paint for All Application Methods
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously prepared, either by shot blasting or sandblasting to an impressive Sa2.5 level, or through manual rust removal to a precise St3 level.
3. Construction conditions:
Ensure the substrate temperature surpasses the dew point by a comforting 3°C, with relative humidity kept under 85% and wind force no greater than level 3. Construction should cease if the substrate temperature falls below 5°C, as the epoxy resin and curing agent cease to react. Avoid outdoor endeavors on rainy, foggy, windy, sandy days and during morning and evening condensation.
4. Notes:
1. Prior to use, engage in mechanical stirring to achieve a harmonious mix of component A, followed by a perfect fusion with component B.
2. Regular stirring during the coating process is crucial to avert sedimentation, which can disrupt the delicate balance of powder to liquid ratio, potentially compromising the paint film's quality.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats for optimal coverage.
4. Once mixed, the two-component paint should ideally be utilized within 5 hours to preserve its superior quality; using beyond this time frame may impact coating integrity.
5. After the curing agent's use, ensure it is tightly sealed and consumed swiftly to prevent any undesirable reactions with moisture in the air, safeguarding against potential loss.
Discuss this product for your project
Include your application, required quantity and destination.
