Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 All-Weather Matt Epoxy Primer Coating - 20kg for Outdoor Durability
FD-H001 two-component epoxy primer for steel substrates. Intended for outdoor use.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface undergoes shot blasting or sand blasting to Sa2.5 level, or manual rust-removal to reach St3 level.
3. Construction conditions:
For optimal application, ensure the substrate temperature is at least 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the epoxy resin and curing agent halt reactions, requiring a pause in construction. Avoid outdoor application during rainy, foggy, windy, or sandy weather, and steer clear of morning and evening condensation.
4. Notes:
1. Prior to use, mechanically stir component A thoroughly, then blend evenly with component B.
2. Continuously stir during the application process to prevent sedimentation, which can disrupt the powder-liquid balance and compromise the paint film's quality.
3. Aim for a dry film thickness of at least 70μm, applying 1 to 2 coats.
4. After mixing, it is crucial to use the two-component paint within 5 hours. Exceeding this timeframe may degrade the coating quality.
5. Once the curing agent is depleted, seal it tightly and utilize it promptly to prevent any losses from reactions with water vapor in the atmosphere.
Discuss this product for your project
Include your application, required quantity and destination.
