Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Corrosion Coating: Epoxy Zinc Primer for Chemical Industry Safety
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- Signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Superior Anti-Corrosion Coating: Epoxy Zinc Primer for Chemical Industry Safety

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to achieve Sa2.5 level, or manually cleaned to St3 level for optimal performance.
3.Construction conditions:
The substrate temperature must exceed the dew point by 3°C, with relative humidity maintained under 85%, and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the reaction between the epoxy resin and curing agent ceases, necessitating a halt in construction activities. Outdoor work should avoid rainy, foggy, windy, and sandy conditions, as well as morning and evening condensation.
4.Notes:
1. Prior to application, ensure thorough mechanical stirring of component A, then blend it uniformly with component B.
2. Maintain regular stirring during the application process to prevent sedimentation, which could disrupt the powder-to-liquid ratio and compromise the paint film's quality.
3. Aim for a dry film thickness of at least 70μm, typically achieved through 1 to 2 coats.
4. Once mixed, the two-component paint should ideally be used within a 5-hour window. Prolonged exposure may degrade the coating's integrity.
5. Seal the curing agent tightly after use to prevent undesirable reactions with ambient water vapor, which could lead to losses.
Discuss this product for your project
Include your application, required quantity and destination.
