Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Corrosion Epoxy Primer with Zinc Technology
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Steel surfaces must be meticulously prepared through shot or sand blasting to achieve a smooth Sa2.5 standard, or manually treated to reach St3 level, ensuring optimal primer adherence.
3.Construction conditions:
For best results, ensure the substrate temperature exceeds the dew point by 3°C, with relative humidity under 85%, and wind force not exceeding level 3. If the temperature drops below 5°C, the reaction between the epoxy resin and curing agent halts, necessitating a pause in construction. Avoid proceeding during adverse weather conditions such as rain, fog, or strong winds, and watch out for condensation during dawn and dusk in outdoor settings.
4.Notes:
1. Before commencing, vigorously use mechanical stirring to blend component A, then evenly unite it with component B, ensuring a uniform mix.
2. Maintain regular stirring throughout the application process to avert sedimentation, which could disrupt the powder-to-liquid ratio, potentially compromising the quality of the paint film.
3. Aim for a dry film thickness of no less than 70μm, applying 1 to 2 coats for optimal coverage.
4. The two-component paint mixture should ideally be utilized within 5 hours of preparation to maintain impeccable coating quality.
5. After opening, the curing agent must be resealed tightly and used promptly to prevent exposure to air moisture, which could lead to unwanted reactions and material loss.
Discuss this product for your project
Include your application, required quantity and destination.
