Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Corrosion Epoxy Primer (Zinc-Rich)
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot or sand blasted to Sa2.5 level or manually rust-removed to St3 level.
3.Construction conditions:
To ensure optimal application, the substrate temperature must remain 3°C above the dew point with relative humidity under 85% and wind force at level 3 or below. If the substrate temperature falls below 5°C, the reaction between epoxy resin and curing agent halts, necessitating a pause in construction. Avoid inclement weather such as rain, fog, wind, sand, and condensation during outdoor application.
4.Notes:
1. Prior to use, thoroughly stir component A using mechanical equipment, then uniformly mix with component B.
2. Maintain regular stirring during the coating process to prevent sedimentation, which could disrupt the powder-to-liquid balance and compromise the paint film's quality.
3. For an optimal finish, ensure the dry film thickness is at least 70μm. Apply 1 to 2 coats as necessary.
4. Post-mixing, utilize the two-component paint within 5 hours for best results, as exceeding this timeframe may diminish coating quality.
5. Once the curing agent is opened, secure it tightly and use promptly to minimize loss from reactions with airborne water vapor.
Discuss this product for your project
Include your application, required quantity and destination.