Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Corrosion Protection: Zinc Epoxy Primer for Steel Buildings
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
3. Construction conditions:
Ensure optimal application by maintaining the substrate temperature at least 3°C above the dew point, with relative humidity under 85% and a wind force no greater than level 3. If the substrate temperature drops below 5°C, halt construction as epoxy resin and curing agent reactions may cease. Avoid construction during rainy, foggy, windy, or sandy conditions, and watch for morning or evening condensation when working outdoors.
4. Notes:
1. Prior to application, utilize mechanical stirring to thoroughly mix component A, then blend with component B for an even consistency.
2. Continually stir during the coating process to prevent sedimentation, which could disrupt the powder to liquid balance and degrade paint film quality.
3. We recommend ensuring a dry film thickness of at least 70μm, with one to two coats applied for optimal coverage.
4. After mixing, it is advisable to use the two-component paint within 5 hours to uphold coating quality.
5. Once the curing agent has been opened, secure it tightly and utilize swiftly to avoid any adverse reactions with ambient moisture, ensuring no product loss.
Discuss this product for your project
Include your application, required quantity and destination.
