Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Anti-Rust Zinc Epoxy Primer: Application for Steel Buildings
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously shot or sand-blasted to Sa2.5 level, ensuring pristine condition, or manually treated to St3 level for optimal adhesion.
3. Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, maintaining relative humidity under 85% and wind force at or below level 3. Should the substrate temperature fall below 5°C, halt construction as epoxy reactions cease. Avoid adverse weather conditions including rain, fog, or strong winds, and condensation during twilight hours for outdoor projects.
4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then combine it uniformly with component B.
2. Continuously stir during application to avoid sedimentation, ensuring an even powder-to-liquid ratio for a flawless paint film.
3. For best results, aim for a dry film thickness of at least 70μm with 1 to 2 coats.
4. Mix and use the two-component paint within 5 hours to maintain optimal coating quality. Exceeding this time frame can compromise performance.
5. After using the curing agent, seal the container promptly and use it up quickly to avoid degradation from air moisture exposure.
Discuss this product for your project
Include your application, required quantity and destination.