Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Dual Component Epoxy Coating for Brush Application
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Dual Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface undergoes meticulous shot blasting or sandblasting to Sa2.5 level, or manual rust removal to St3 level for ideal priming.
3.Construction conditions:
Ensure substrate temperature is 3°C above the dew point, with relative humidity <85% and wind force ≤ level 3. Construction should cease if substrate temperature falls below 5°C, halting epoxy resin and curing agent reactions. Avoid rainy, foggy, or overly windy conditions that may cause morning or evening condensation during outdoor application.
4.Notes:
1. Prior to application, use mechanical stirring to evenly mix component A, then blend comprehensively with component B.
2. Regular stirring during application is essential to avoid sedimentation, which can upset the balance of powder to liquid ratio, potentially impairing the quality of the paint film.
3. It is advisable to maintain a dry film thickness ≥70μm, with 1 to 2 coats applied for optimal results.
4. Post-mixing, the two-component paint should be used within 5 hours to ensure coating quality is not compromised.
5. To prevent unwanted reactions with air moisture, ensure the curing agent is sealed tightly and utilized promptly after opening.
Discuss this product for your project
Include your application, required quantity and destination.
