Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Dual Component Epoxy Coating High Pressure Air Spray
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Dual Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to Sa2.5 level or manually rust-removed to St3 level, ensuring a pristine preparation for coating.
3. Construction conditions:
To ensure optimal application results, maintain the substrate temperature at least 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent cease to react, necessitating a halt in construction. Avoid proceeding on rainy, foggy, windy, or sandy days, and be cautious of morning and evening condensation during outdoor projects.
4. Notes:
1. Prior to usage, engage in thorough mechanical stirring to achieve a uniform mix of component A before combining it evenly with component B.
2. Consistently stir throughout the coating process to avert sedimentation, which can unbalance the powder to liquid ratio, impacting the paint film's quality.
3. It is advised to achieve a dry film thickness of ≥70μm, completing 1 to 2 coats for optimal coverage.
4. Once mixed, the two-component paint should be used within 5 hours to preserve coating quality.
5. After utilizing the curing agent, securely cover it and use it promptly to prevent adverse reactions with airborne water vapor, thus avoiding potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
