Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Dual Component Epoxy Coating with Matt Finish
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level, ensuring optimal adhesion.
3.Construction conditions:
The substrate temperature must be 3°C above the dew point with a relative humidity under 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the reaction between epoxy resin and curing agent halts, necessitating a pause in construction. Avoid construction in adverse weather like rainy, foggy, or windy days, or during early and late-day condensation.
4.Notes:
1. Before use, ensure thorough mechanical stirring of component A for uniformity, followed by mixing with component B.
2. Regular stirring during the coating process is vital to prevent sedimentation, which could skew the powder-to-liquid ratio, compromising the paint film quality.
3. Recommended dry film thickness is ≥70μm, accomplished over 1 to 2 coats for best results.
4. Use the mixed two-component paint within 5 hours to maintain coating quality; exceeding this timeframe could degrade performance.
5. Once the curing agent is depleted, seal it tightly and use promptly to avert losses from reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
