Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Dual Component Matt Epoxy Coating - 20kg for Air Spray and Brush
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Dual Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is treated by shot blasting or sand blasting to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
The substrate temperature should be 3°C above the dew point, with relative humidity below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, halt construction as the epoxy resin and curing agent cease reacting. Avoid adverse weather conditions such as rain, fog, strong winds, or condensation, especially during outdoor applications.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, and then blend evenly with component B.
2. Stir regularly during the coating process to prevent sedimentation and ensure a balanced powder-to-liquid ratio, maintaining optimal paint film quality.
3. The dry film thickness should be ≥70μm with 1 to 2 coats recommended for best results.
4. Utilize the mixed two-component paint within 5 hours to ensure coating integrity. Extended time may compromise quality.
5. Seal the curing agent tightly after use and consume promptly to avoid losses due to reactions with ambient water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
