Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Durable Matt Epoxy Primer Coating - Ideal for Various Construction Methods
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
Achieve optimal results by preparing the steel surface through shot or sand blasting to Sa2.5 level, or removing rust manually to St3 level.
3. Construction Conditions:
Ensure the substrate temperature exceeds the dew point by 3°C, with relative humidity remaining under 85% and wind force not exceeding level 3. If substrate temperature falls below 5°C, halt construction as the epoxy resin and curing agent will not react. Schedule outdoor work to avoid rain, fog, wind, sandy conditions, and morning or evening condensation.
4. Notes:
1. Prior to application, thoroughly blend component A with mechanical stirring before combining it with component B.
2. Maintain consistent stirring during the application to prevent sedimentation, ensuring a balanced powder-to-liquid ratio and preserving the paint film's integrity.
3. For best results, ensure the dry film thickness reaches ≥70μm, applying 1 to 2 coats.
4. Utilize the mixed two-component paint within 5 hours to maintain optimal coating quality. Delays can compromise performance.
5. Upon depletion of the curing agent, secure the container tightly and use promptly to avoid deterioration from atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
