Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Durable Matt Finish Epoxy Zinc Rich Primer Paint for Easy Application
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface must be meticulously prepared through shot or sand blasting to Sa2.5 level or manually to St3 level, ensuring optimal adhesion and performance.
3.Construction conditions:
Ensure a substrate temperature at least 3°C above the dew point with relative humidity below 85%, and wind force not exceeding level 3. Construction should halt if the substrate temperature drops below 5°C to prevent reaction cessation between the epoxy resin and curing agent. Avoid adverse weather for outdoor applications to maintain paint quality.
4.Notes:
1. Use mechanical stirring to ensure component A is mixed thoroughly before combining it with component B for uniformity.
2. Consistently stir the mixture during application to avoid sedimentation, which could compromise the paint film's integrity.
3. Maintain a dry film thickness of at least 70μm, applying 1 to 2 coats for optimal coverage.
4. Use the two-component paint within 5 hours post-mixing to avoid quality degradation.
5. Seal the curing agent tightly after use and consume promptly to prevent loss from moisture-induced reactions.
Discuss this product for your project
Include your application, required quantity and destination.
