Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Easy Application Matt Epoxy Primer Coating - Suitable for All Tools
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti-Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface is expertly shot blasted or sand blasted to a refined Sa2.5 level, or meticulously rust-removed to a precise St3 level.
3. Construction Conditions:
Ensure the substrate temperature is a minimum of 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. Should the substrate temperature drop below 5°C, the reaction between the epoxy resin and curing agent ceases, halting construction until conditions improve. Avoid constructing outdoors on rainy, foggy, windy, sandy days or during morning and evening condensation.
4. Notes:
1. Prior to application, utilize mechanical stirring to thoroughly mix component A, then mix it evenly with component B for optimal results.
2. Maintain regular stirring during the coating application to avert sedimentation, preventing imbalance in the powder-to-liquid ratio which could compromise the paint film's quality.
3. For best protection, it is advisable that the dry film thickness be no less than 70μm, achieved in 1 to 2 coats.
4. After mixing, the two-component paint should ideally be used within 5 hours to maintain coating quality.
5. To prevent undesirable reactions with ambient water vapor, tightly seal the curing agent after use and consume it promptly.
Discuss this product for your project
Include your application, required quantity and destination.
