Model: FD-H001

FD-H001 Efficient Matt Epoxy Paint Primer for High Pressure Airless Use

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1. Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, offering superioranti-rustproperty. It boasts strongadhesion, and excellent oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2. Surface treatment:
The steel surface is expertly prepared by shot blasting or sandblasting to Sa2.5 level, or manually rust-removed to St3 level for optimal results.

3. Construction conditions:
The substrate temperature must be at least 3°C above the dew point, with relative humidity under 85%, and wind force no greater than level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent reaction halts, necessitating a pause in construction. Avoid outdoor construction during rainy, foggy, windy, or sandy conditions, as well as during morning and evening condensation.

4. Notes:
1. Prior to use, thoroughly mix component A using mechanical stirring, then combine evenly with component B.
2. Regular stirring during application is essential to prevent sedimentation, which could lead to an imbalanced powder-to-liquid ratio and compromise the paint film's quality.
3. It is recommended to achieve a dry film thickness of at least 70μm, with the application of 1 to 2 coats.
4. Once mixed, the two-component paint should generally be used within 5 hours to maintain coating quality.
5. After using the curing agent, seal it tightly and use it promptly to prevent losses due to reactions with atmospheric water vapor.

FD-H001 Efficient Matt Epoxy Paint Primer for High Pressure Airless Use
FD-H001 Efficient Matt Epoxy Paint Primer for High Pressure Airless Use

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote