Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Coating - Matt Luster, 20kg, Suitable for Air Spray Application
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously prepared, either shot blasted or sandblasted to a pristine Sa2.5 level, or manually cleaned to achieve a thorough St3 level rust removal.
3. Construction conditions:
The substrate temperature must consistently be 3°C above the dew point, with relative humidity maintained below 85%, and wind force not exceeding level 3. If the substrate temperature falls below 5°C, the epoxy resin and curing agent will cease to react, necessitating a halt in construction. Outdoor projects should avoid rainy, foggy, windy, or sandy days and steer clear of morning and evening condensation.
4. Notes:
1. Prior to use, ensure component A is thoroughly mixed with mechanical stirring, then blend it evenly with component B for optimal results.
2. During the coating process, maintain regular stirring to avert sedimentation, which could disrupt the powder-to-liquid ratio, potentially compromising the quality of the paint film.
3. The recommended dry film thickness should be at least 70μm, with 1 to 2 coats applied for best outcomes.
4. Once mixed, the two-component paint should ideally be used within 5 hours. Exceeding this time frame may degrade the quality of the coating.
5. Ensure the curing agent container is tightly sealed after use to prevent unwanted reactions with atmospheric moisture, which could lead to material loss.
Discuss this product for your project
Include your application, required quantity and destination.
