Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Coating - Perfect for High Pressure Airless Spray
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared using shot blasting or sand blasting to achieve an Sa2.5 level, or manually rust-removed to St3 level, ensuring optimal adhesion and performance.
3.Construction conditions:
To ensure the best results, the substrate temperature must exceed the dew point by 3°C, with relative humidity maintained below 85% and wind force not exceeding level 3. Construction should be halted if the temperature falls below 5°C, as the epoxy resin and curing agent will not react. Avoid unfavorable weather conditions such as rain, fog, wind, sand, and morning or evening condensation for outdoor applications.
4.Notes:
1. Before application, component A should be mechanically stirred thoroughly, then mixed uniformly with component B to ensure consistency.
2. It is crucial to regularly stir during the coating process to prevent sedimentation, which could disrupt the powder to liquid ratio and potentially compromise the integrity of the paint film.
3. The recommended dry film thickness is at least 70μm, achieved through 1 to 2 coats for optimal protection.
4. Once mixed, the two-component paint should ideally be used within 5 hours, as extended exposure may degrade the coating quality.
5. After using the curing agent, ensure it is sealed tightly and utilized promptly to prevent any loss due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
