Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Coating - Suitable for Brush and Roll
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface must be meticulously shot blasted or sand blasted to a pristine Sa2.5 level, or carefully rust-removed to St3 level.
3. Construction Conditions:
Ensure the substrate temperature surpasses the dew point by at least 3°C, with humidity levels staying under 85%, and wind forces not exceeding level 3. Construction is to be paused when substrate temperatures drop below 5°C, as the epoxy resin and curing agent cease their reactions. Avoid operating on rainy, foggy, windy, sandy days, and during times of condensation, such as mornings and evenings, for outdoor projects.
4. Notes:
1. Prior to use, mechanically stir component A until it is thoroughly mixed, then combine it evenly with component B for optimal results.
2. During the coating procedure, remember to stir periodically to avert sedimentation, which can disrupt the powder to liquid balance, thereby impacting the paint film's quality.
3. It is advisable for the dry film thickness to be at least 70μm, with 1 to 2 coats applied for best effect.
4. Once mixed, the two-component paint should be utilized within 5 hours to maintain coating integrity; exceeding this duration may compromise quality.
5. After using the curing agent, seal it tightly and consume promptly to avert any spoilage due to reactions with moisture in the air.
Discuss this product for your project
Include your application, required quantity and destination.
