FD-H001 Epoxy Paint Primer for All Construction Methods
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
The substrate temperature must be 3°C higher than the dew point, relative humidity <85%, wind force ≤ level 3; when the substrate temperature is lower than 5°C, the epoxy resin and curing agent stop reacting and construction should be stopped. Avoid rainy, foggy, windy and sandy days and condensation in the morning and evening for outdoor construction.
4.Notes:
1. Before use, utilize mechanical stirring to thoroughly mix component A, then blend it uniformly with component B.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which could disrupt the powder to liquid ratio, thereby affecting the paint film's quality.
3. It is advisable that the dry film thickness be maintained at ≥70μm, completing 1 to 2 coats for optimal results.
4. After mixing, the dual-component paint should be used within 5 hours; exceeding this duration may compromise the coating quality.
5. Upon depletion of the curing agent, ensure it is covered tightly and consumed promptly to prevent losses due to reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.