Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Paint Primer for High Pressure Airless Spray
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to achieve Sa2.5 level, ensuring a flawless finish, or manually rust-removed to St3 level.
3.Construction conditions:
The substrate temperature needs to be at least 3°C above the dew point, with relative humidity maintained below 85%, and wind force not exceeding level 3; if the substrate temperature falls below 5°C, the reaction between epoxy resin and curing agent ceases, halting construction. Avoid construction on rainy, foggy, windy, and sandy days, and during morning and evening condensation for outdoor applications.
4.Notes:
1. Prior to application, component A should be thoroughly mixed using mechanical stirring, followed by even mixing with component B.
2. Stir regularly during the coating process to prevent sedimentation, ensuring a stable powder to liquid ratio and preserving the integrity of the paint film.
3. It is advised that the dry film thickness be at least 70μm, completed in 1 to 2 coats for optimal coverage.
4. After mixing, the two-component paint should ideally be consumed within 5 hours to maintain optimal coating quality.
5. Once the curing agent is exhausted, it should be sealed tightly and consumed promptly to prevent degradation from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
