Model: FD-H001

FD-H001 Epoxy Paint Primer for Optimal Surface Preparation

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is meticulously prepared by shot or sand blasting to the impeccable Sa2.5 level, or carefully rust-removed manually to achieve the St3 standard.

3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity not exceeding 85%, and wind force maintained at or below level 3. When the substrate temperature drops below 5°C, the reaction between epoxy resin and curing agent ceases, halting construction. Outdoor work should avoid adverse conditions such as rain, fog, wind, sand, and condensation during morning and evening hours.

4.Notes:
1. Prior to application, vigorously stir component A using mechanical methods until thoroughly uniform, then blend seamlessly with component B for optimal results.
2. Consistently stir the mixture throughout the coating process to avert sedimentation, thereby maintaining the proper powder to liquid ratio and ensuring the highest quality paint film.
3. For best outcomes, the dry film thickness should be maintained at or above 70μm, completing the application in one to two coats.
4. Post-mixing, the two-component paint should ideally be utilized within 5 hours to preserve coating quality.
5. Ensure the curing agent is securely sealed and used promptly after opening to prevent losses due to reactions with atmospheric moisture.

FD-H001 Epoxy Paint Primer for Optimal Surface Preparation
FD-H001 Epoxy Paint Primer for Optimal Surface Preparation

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote