Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Paint Primer with High Pressure Airless Spray
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to achieve a pristine Sa2.5 level, or manually refined to an St3 level to ensure optimal adhesion and performance.
3.Construction conditions:
For impeccable results, the substrate temperature must be precisely 3°C above the dew point with a relative humidity of less than 85%, and wind conditions should not exceed level 3. When the substrate temperature falls below 5°C, the epoxy resin and curing agent cease their reaction, mandating a halt in construction. To maintain quality, avoid construction during rainy, foggy, windy, and sandy conditions, as well as during morning and evening condensation for outdoor projects.
4.Notes:
1. Prior to application, ensure that component A is thoroughly mixed using mechanical stirring, followed by an even blend with component B for optimal consistency.
2. Consistent stirring throughout the coating process is crucial to prevent sedimentation, which can disrupt the powder to liquid ratio, thereby compromising the integrity of the paint film.
3. To achieve the desired protective layer, it is recommended that the dry film thickness be maintained at ≥70μm, with the application of 1 to 2 coats.
4. Once mixed, the two-component paint should be utilized within a 5-hour window to prevent degradation in coating quality.
5. After using the curing agent, ensure the container is sealed tightly to prevent reactions with airborne water vapor, and utilize promptly to minimize product loss.
Discuss this product for your project
Include your application, required quantity and destination.
