Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Primer Coating for High Pressure Airless Spray
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti-Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is expertly shot blasted or sand blasted to an impeccable Sa2.5 level, or professionally rust-removed to a pristine St3 level.
3.Construction conditions:
For optimal performance, ensure the substrate temperature is always 3°C above the dew point with a relative humidity below 85%, and wind force no greater than level 3. Should the substrate dip below 5°C, the reaction between the epoxy resin and curing agent ceases, necessitating a halt in construction. Avoid days with rain, fog, strong winds, and sandstorms, as well as morning and evening condensation, for any outdoor application.
4.Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then blend evenly with component B for a flawless finish.
2. Consistent stirring throughout the coating process is crucial to prevent sedimentation, ensuring a balanced powder-to-liquid ratio and maintaining the high quality of the paint film.
3. For best results, aim for a dry film thickness of at least 70μm, completing 1 to 2 coats to achieve an optimal protective layer.
4. Once mixed, the two-component paint should ideally be used within 5 hours to preserve coating quality, as exceeding this timeframe may compromise the finish.
5. After utilizing the curing agent, ensure it is tightly sealed and used promptly to prevent unfavorable reactions with atmospheric water vapor, safeguarding against potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
