Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Primer Coating for Professionals
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti-Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface must be meticulously shot or sand blasted to a Sa2.5 level, or manually refined to an St3 level to ensure optimal adhesion.
3.Construction conditions:
The substrate temperature must exceed the dew point by 3°C, maintaining relative humidity below 85%, and wind conditions not surpassing level 3. Construction should be halted if the substrate temperature falls below 5°C as epoxy resin and curing agent reactions are inhibited. Avoid unfavorable weather conditions like rain, fog, high winds, and sandstorms, and steer clear of morning and evening condensation during outdoor applications.
4.Notes:
1. Mechanically stir component A thoroughly prior to use, then blend uniformly with component B to assure consistency.
2. Consistently stir during the coating process to avoid sedimentation that can disrupt the powder-to-liquid ratio, thereby affecting the paint film's quality.
3. Achieve a dry film thickness of ≥70μm with the application of 1 to 2 coats for optimal performance.
4. Utilize the mixed two-component paint within 5 hours to maintain coating quality, as extended times can compromise the finish.
5. Once the curing agent is opened, seal it tightly and consume promptly to prevent degradation from ambient moisture interaction.
Discuss this product for your project
Include your application, required quantity and destination.
