Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Primer for Brush and High Pressure Airless Spray
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot or sand blasting to the Sa2.5 level, or manually rust-treated to the St3 level, ensuring optimal adhesion and longevity.
3.Construction conditions:
For perfect results, ensure substrate temperature exceeds the dew point by 3°C, humidity is under 85%, and wind force is no more than level 3. Construction halts if the temperature dips below 5°C, as the epoxy and curing agent cease reacting. Avoid outdoor tasks during adverse weather like rain, fog, strong winds, or sandstorms, and stay clear of morning and evening condensation.
4.Notes:
1. Before application, mechanically stir component A thoroughly, then blend it seamlessly with component B to ensure a uniform mixture.
2. Regular stirring during application is crucial to prevent sedimentation, which can disrupt the powder-to-liquid balance and compromise the paint film quality.
3. Aim for a dry film thickness of ≥70μm, executing between 1 to 2 coats for the best coverage and protection.
4. Once mixed, the two-component paint should ideally be used within 5 hours to maintain quality; extended exposure can diminish effectiveness.
5. After using the curing agent, seal it tightly to prevent reactions with moisture in the air, and use it up promptly to avoid unnecessary loss.
Discuss this product for your project
Include your application, required quantity and destination.
