Model: FD-H001

FD-H001 Epoxy Primer for High Pressure Airless Applications

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

FD-H001 Epoxy Primer for High Pressure Airless Applications
1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxy resinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Highshielding property, superioranti-rustproperty, strongadhesion, and good oilandwaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:
The steel surface is prepared to perfection: shot or sand blasted to Sa2.5, or manually cleared to St3 standard.

3.Construction conditions:
For optimum results, maintain substrate temperature 3°C above dew point, relative humidity below 85%, and wind speed no more than level 3. Construction halts at temperatures under 5°C as the epoxy and hardener reaction ceases. Steer clear of rainy, foggy, windy, sandy conditions, and times of condensation.

4.Notes:
1. Prior to application, ensure thorough mixing of component A using mechanical stirring before blending evenly with component B.
2. Stir consistently throughout application to prevent sedimentation and preserve the ideal powder-liquid balance, ensuring impeccable film quality.
3. Target a dry film thickness of at least 70μm with the application of 1 to 2 coats for optimal performance.
4. Utilize the mixed two-component paint within 5 hours to maintain optimal coating quality.
5. After use, seal the curing agent tightly to prevent air moisture reactions and use promptly to minimize wastage.

FD-H001 Epoxy Primer for High Pressure Airless Applications
FD-H001 Epoxy Primer for High Pressure Airless Applications

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote