Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Coating - Ideal for Air Spray, Brush, and Roll
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Epoxy Zinc Primer Anti Corrosive Coating for Chemical Plant Safety and Durability
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously prepared, achieving an impeccable Sa2.5 level through shot or sand blasting, or manually refined to a pristine St3 level.
3. Construction conditions:
Ensure optimal conditions with substrate temperatures maintaining a 3°C elevation above the dew point and relative humidity below 85%, with wind force not exceeding level 3. Halt construction when substrate temperatures dip below 5°C, as the epoxy resin and curing agent react sluggishly. Steer clear of rainy, foggy, windy, or sandy weather conditions, and morning and evening condensation for outdoor applications.
4. Notes:
1. Prior to application, mix component A thoroughly with mechanical stirring, ensuring a harmonious blend before incorporating component B.
2. Maintain consistent agitation throughout the coating process to avert sedimentation and maintain a balanced powder to liquid ratio, preserving the superior quality of the paint film.
3. Aim for a dry film thickness of ≥70μm, with 1 to 2 coats for optimal coverage.
4. Utilize the two-component paint within 5 hours of mixing to ensure peak efficacy; delays could compromise coating quality.
5. Once the curing agent is opened, seal it tightly after use and consume promptly to avoid detrimental reactions with ambient moisture.
Discuss this product for your project
Include your application, required quantity and destination.
