Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Coating - Matt Luster for Brush and Roller Application
FD-H001 two-component epoxy anti-corrosion coating for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Epoxy Zinc Primer Anti Corrosive Coating for Chemical Plant Safety and Durability
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface should be meticulously shot or sand blasted to Sa2.5 level, or manually derusted to the St3 standard for optimal coating adhesion.
3. Construction conditions:
For optimal results, ensure the substrate is at least 3°C warmer than the dew point, with humidity below 85%, and wind levels not exceeding force 3. If the substrate is cooler than 5°C, reactions halt, requiring a pause in application. Avoid adverse weather conditions such as rain, fog, wind, or sand, as well as morning or evening condensation during outdoor applications.
4. Notes:
1. Prior to application, thoroughly stir component A mechanically before mixing it thoroughly with component B.
2. Regular stirring throughout the coating process prevents sedimentation, ensuring a balanced powder-to-liquid ratio and maintaining paint film quality.
3. Aim for a dry film thickness of at least 70μm, applying one to two coats as needed.
4. Once mixed, use the two-component paint within 5 hours to preserve the quality of the application.
5. Securely cover and promptly use any leftover curing agent to prevent adverse reactions with moisture in the air and potential material losses.
Discuss this product for your project
Include your application, required quantity and destination.
