Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Primer: Anti-Corrosion Coating for Chemical Plant Applications
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- Signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Epoxy Zinc Primer: Anti-Corrosion Coating for Chemical Plant Applications

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
The steel surface should be meticulously shot or sand blasted to achieve Sa2.5 level, or manually treated to reach St3 level, ensuring optimal preparation.
3. Construction Conditions:
Ensure substrate temperature remains 3°C above the dew point with relative humidity below 85%, and wind conditions at or below level 3. Construction should halt if substrate temperature is below 5°C, as the epoxy resin and curing agent cease to react. Avoid construction on rainy, foggy, windy, or sandy days, as well as during times of morning or evening condensation outdoors.
4. Notes:
1. Prior to application, ensure mechanical stirring blends component A thoroughly before combining it evenly with component B.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which can disrupt the balance between powder and liquid, compromising the paint film quality.
3. It is recommended to achieve a dry film thickness of at least 70μm, completing 1 to 2 coats for best results.
4. After mixing, the two-component paint should ideally be used within 5 hours to preserve its optimal quality.
5. Once the curing agent is depleted, ensure it is sealed tightly and consumed promptly to mitigate losses from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
