Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer for Steel Structures
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Prepare the steel surface meticulously by shot blasting or sand blasting to Sa2.5 level, or achieve manual rust-removal to St3 level for optimal results.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point with relative humidity under 85% and wind force at or below level 3. If substrate temperatures drop below 5°C, the epoxy resin and curing agent cease to react, thus halting construction. Avoid days with rain, fog, strong winds, or sand, and prevent condensation during early mornings or late evenings when working outdoors.
4.Notes:
1. Begin by mechanically stirring component A until it's evenly mixed, followed by a thorough blend with component B.
2. Maintain regular stirring throughout the coating process to avert sedimentation, which can disrupt the powder to liquid ratio, compromising the paint film quality.
3. Aim for a dry film thickness of no less than 70μm and complete 1 to 2 coats for best protection.
4. Post-mixing, utilize the two-component paint within 5 hours to ensure optimal coating quality.
5. Securely seal the curing agent after use and consume promptly to avoid losses from reactions with moisture in the air.
Discuss this product for your project