Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint for Air Spray and Brush Use
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be meticulously shot blasted or sand blasted to an impeccable Sa2.5 level, or manually rust-removed to a pristine St3 level.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity maintained below 85%, and wind force not exceeding level 3. If the substrate temperature drops below 5°C, the reaction between the epoxy resin and curing agent halts, necessitating a pause in construction. Avoid commencing work under the threat of rain, fog, strong winds, sandstorms, or condensation during morning and evening hours for outdoor applications.
4.Notes:
1. Prior to application, thoroughly mix component A mechanically until homogeneous, then blend evenly with component B.
2. Regular stirring during the coating process is imperative to prevent sedimentation that could disrupt the powder-to-liquid ratio, thus compromising the paint film's quality.
3. Aim for a dry film thickness of ≥70μm, completing 1 to 2 coats to ensure optimal coverage.
4. Use the mixed two-component paint within 5 hours to maintain coating integrity, as delays can degrade quality.
5. After using the curing agent, seal it tightly to prevent any reaction with atmospheric moisture, minimizing potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
