Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint for Easy Application
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared using shot blasting or sand blasting to achieve a pristine Sa2.5 level, or manually refined to reach the St3 level.
3.Construction conditions:
To ensure optimal results, the substrate temperature should be at least 3°C above the dew point with relative humidity maintained under 85%, and wind forces should not exceed level 3. If the substrate temperature falls below 5°C, reactions between the epoxy resin and curing agent cease, halting construction. Additionally, avoid proceeding on days with rain, fog, strong winds, or sand storms, and steer clear of morning and evening condensation for outdoor applications.
4.Notes:
1. Prior to application, ensure that component A is homogeneously mixed through mechanical stirring, followed by thorough blending with component B.
2. Maintain a consistent stirring routine during the coating process to prevent sedimentation, which could disrupt the powder-to-liquid balance and impair the quality of the paint film.
3. It is advisable to achieve a dry film thickness of at least 70μm, completing 1 to 2 coats for maximum effectiveness.
4. Once mixed, the two-component paint should be utilized within a 5-hour window to maintain coating integrity.
5. Ensure that any remaining curing agent is tightly sealed and used promptly to prevent adverse reactions with atmospheric moisture, which could lead to material loss.
Discuss this product for your project
Include your application, required quantity and destination.
