Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint for High Pressure and Air Spray Methods
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
The substrate temperature must be at least 3°C above the dew point, with relative humidity under 85%, and wind forces not exceeding level 3. When substrate temperatures fall below 5°C, the epoxy resin and curing agent cease to react, halting construction. Avoid weather conditions like rain, fog, wind, sandy environments, and condensation during mornings and evenings for outdoor work.
4.Notes:
1. Prior to use, ensure thorough mechanical stirring of component A before evenly mixing with component B.
2. Maintain regular stirring throughout the coating process to prevent sedimentation, which can disrupt the powder-to-liquid balance and compromise the paint film quality.
3. Recommended dry film thickness should be no less than 70μm, with the application of 1 to 2 coats.
4. Once mixed, the two-component paint should be utilized within 5 hours to maintain optimal coating quality.
5. Seal the curing agent tightly after use and consume swiftly to avert losses from air moisture reactions.
Discuss this product for your project
Include your application, required quantity and destination.
