FD-H001 Epoxy Zinc Rich Primer Paint for Professional-Grade Surface Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared using shot or sand blasting to achieve Sa2.5 level, or manually cleaned to St3 level for optimal adhesion.
3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, with relative humidity staying below 85%, and wind force not exceeding level 3. Construction should be halted if substrate temperature drops below 5°C as epoxy resin and curing agent reactions cease. Avoid adverse weather conditions such as rain, fog, wind, sand, and condensation, especially outdoors.
4.Notes:
1. Employ mechanical stirring to achieve a uniform mix of component A before combining with component B for consistency.
2. Maintain regular stirring during application to prevent sedimentation, ensuring a balanced powder to liquid ratio and preserving paint film quality.
3. It is advisable for the dry film thickness to be at least 70μm, completing 1 to 2 coats for optimal coverage.
4. Use the two-component paint within 5 hours post-mixing to maintain peak coating performance.
5. After using the curing agent, seal the container tightly and use promptly to prevent reaction losses with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.