Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint: Ideal for Air Spray and Brush Use
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to Sa2.5 level, or carefully rust-removed by hand to St3 level, ensuring a pristine base for coating.
3.Construction conditions:
Ensure optimal conditions with substrate temperature exceeding the dew point by 3°C, relative humidity maintained below 85%, and wind force not surpassing level 3. Suspend construction if the substrate temperature falls below 5°C, as the epoxy resin and curing agent cease to react. Refrain from outdoor work during inclement weather, such as rain, fog, strong winds, or sand, as well as during morning and evening condensation.
4.Notes:
1. Initiate the process by thoroughly mixing component A using mechanical stirring, followed by an even blend with component B.
2. During application, consistently stir to prevent sedimentation and maintain an optimal powder to liquid ratio, thus preserving the integrity of the paint film.
3. Adhere to recommended guidelines by ensuring a dry film thickness of at least 70μm, completing 1 to 2 coats for effective coverage.
4. Utilize the two-component paint within 5 hours post-mixing to avoid compromising the coating quality.
5. After depleting the curing agent, promptly secure the container to prevent reaction with ambient moisture and potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
