Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Epoxy Zinc Rich Primer Paint with Matt Finish for 20kg Barrel
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface Treatment:
Ensure the steel surface is meticulously shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level for optimal results.
3. Construction Conditions:
Before beginning, make sure the substrate temperature is at least 3°C higher than the dew point with a relative humidity of less than 85% and wind force not exceeding level 3. Construction should pause if substrate temperature drops below 5°C as the epoxy resin and curing agent cease to react. Avoid working during rainy, foggy, windy, sandy conditions, and condensation periods in the morning and evening outdoors.
4. Notes:
1. Prior to application, thoroughly mix component A using mechanical stirring, then blend evenly with component B for a consistent mix.
2. Regularly stir throughout the coating process to prevent sedimentation, avoiding imbalance in the powder to liquid ratio which could compromise the integrity of the paint film.
3. It is advisable to achieve a dry film thickness of ≥70μm, completing 1 to 2 coats for optimal coverage.
4. Once mixed, aim to use the two-component paint within 5 hours to maintain quality, as prolonged use may deteriorate the coating.
5. After utilizing the curing agent, ensure it is tightly sealed and used promptly to prevent unwanted reactions with moisture in the air, safeguarding against potential losses.
Discuss this product for your project
Include your application, required quantity and destination.
