Model: FD-H001

FD-H001 Epoxy Zinc Rich Primer Paint with Matt Luster for Optimal Coverage

FD-H001 two-component epoxy primer for steel substrates.

Reference price (FOB)

US $4-10 / kg

QuantityReference price
100-9,999 kgUSD 10.00 / kg
10,000-999,999 kgUSD 8.00 / kg
1,000,000+ kgUSD 4.00 / kg

Minimum order: 100 kg

Confirm the specification, quantity and shipping terms for your quotation.

Request a Quote

Product specifications

Model NO.
FD-H001
Main Raw Material
Epoxy
Method
Spray
Level
Primer
Drying Method
Air Drying
Substrate
Steel
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Luster
Matt
Weight
20kg/Barrel
Construction Method
High Pressure Airless Spray, Air Spray, Brush, Rol
Coating Thickness
Wet Film:80um Dry Film: 40um
After Sales Service
5 Years
Transport Package
Barrel Package in Pallet
Specification
35*30
Trademark
signal
Origin
Dongying China
HS Code
3208100000
Production Capacity
50000ton/Year
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg
Lead Time
7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
Number of components
Two-component
Color
Grey
Proportion
About 2.40
Dry Time
23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio
10:1
Coating thickness
Wet film:80um Dry film: 40um
Construction methord
High pressure airless spray, air spray, brush, roller
Shelf life
12 months

Packaging & shipping

Transport Package
Barrel Package in Pallet
Specification
35*30
Package Size
30.00cm * 30.00cm * 35.00cm
Package Gross Weight
20.000kg

Product description

Product Description

Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint

1.Introduction:

Epoxyzinc-richprimerisatwo-componentcoatingwithepoxyresinasthebasematerial, phosphorironpowder,rust-proofpigment,etc., and cured by polyamide.It ispacked by dual componentsAand B.Characteristics:Experience unparalleled protection with its highshielding properties and superioranti-rustcapabilities, ensuringstrong adhesion and remarkable oilas well aswaterresistance.
Number of components Two-component
Color Grey
Proportion About 2.40
Dry Time 23±2°C   Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
Mixing ratio 10:1
Coating thickness Wet film:80um   Dry film: 40um
Construction methord High pressure airless spray, air spray, brush, roller
Shelf life 12 months

2.Surface treatment:

3.Construction conditions:
Ensure the substrate temperature is at least 3°C above the dew point, maintaining relative humidity under 85% and wind force no greater than level 3. If the temperature dips below 5°C, halt construction as the reaction between epoxy resin and curing agent ceases. Avoid unfavorable weather conditions like rain, fog, strong winds, and sand, as well as morning and evening condensation during outdoor projects.

4.Notes:
1. Prior to use, employ mechanical stirring to blend component A thoroughly, following with a complete blend with component B.
2. Continuously stir during the coating application to avert sedimentation, which might disrupt the powder to liquid ratio and compromise the paint film's integrity.
3. It is advised that the dry film thickness should be at least 70μm, with completion of 1 to 2 coats.
4. After mixing, utilize the two-component paint within a period of 5 hours to maintain optimal coating quality.
5. Once the curing agent is opened, seal it tightly after use and consume promptly to prevent any reaction with atmospheric moisture, avoiding undue loss.

FD-H001 Epoxy Zinc Rich Primer Paint with Matt Luster for Optimal Coverage
FD-H001 Epoxy Zinc Rich Primer Paint with Matt Luster for Optimal Coverage

 

Discuss this product for your project

Include your application, required quantity and destination.

Request a Quote