Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Factory-Grade Two-Component Epoxy Anti-Corrosive Primer Coating
FD-H001 two-component epoxy primer for steel substrates. Supplied in liquid form.
Reference price (FOB)
US $2-10 / kg
| Quantity | Reference price |
|---|---|
| 100-999 kg | USD 10.00 / kg |
| 1,000-999,999 kg | USD 6.00 / kg |
| 1,000,000+ kg | USD 2.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Color
- Grey
- Appearance
- Liquid
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Trademark
- signal
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Origin
- Dongying China
- HS Code
- 3208100000
- Customization
- Available
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Factory Price Double Component Epoxy Anti-Corrosive Primer Coating
1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface undergoes thorough shot blasting or sand blasting to Sa2.5 level, or manual rust removal to St3 level.
3. Construction conditions:
Ensure the substrate temperature is 3°C above the dew point, with relative humidity <85% and wind force ≤ level 3; construction halts if substrate temperature drops below 5°C as the epoxy resin and curing agent cease to react. Avoid outdoor work during rainy, foggy, windy, or sandy conditions, and prevent condensation in the morning and evening.
4. Important Notes:
1. Before application, use mechanical stirring to thoroughly mix component A, then combine it with component B until uniform.
2. Stir regularly during the coating process to avert sedimentation, which may disrupt the powder to liquid ratio, impacting the paint film's quality.
3. It is advisable to achieve a dry film thickness of ≥70μm, with 1 to 2 coats completed.
4. After mixing, the two-component paint should ideally be utilized within 5 hours. Delays may compromise the coating quality.
5. Secure the curing agent tightly after use and deplete it promptly to prevent losses due to reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
