Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Fast-Drying Matt Epoxy Primer Coating - Perfect for Quick Turnarounds
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to achieve a pristine Sa2.5 level, or manually treated to reach the St3 level of rust removal.
3.Construction conditions:
The substrate temperature must consistently be 3°C higher than the dew point, with relative humidity maintained below 85%, and wind force not exceeding level 3. When the substrate temperature drops below 5°C, the reaction between the epoxy resin and curing agent halts, necessitating a halt in construction. It is crucial to avoid rainy, foggy, windy, and sandy conditions, alongside preventing condensation in the morning and evening during outdoor applications.
4.Notes:
1. Before applying, ensure thorough mechanical stirring of component A for a homogeneous mix before combining it evenly with component B.
2. Consistently stir during the application process to avert sedimentation, which could disrupt the powder-to-liquid ratio and potentially compromise the quality of the paint film.
3. For optimal results, the dry film thickness should be ≥70μm, with 1 to 2 coats applied.
4. Once mixed, the two-component paint should preferably be used within 5 hours to avoid any adverse effects on coating quality.
5. After the curing agent is consumed, ensure it is securely covered and utilized promptly to prevent losses resulting from reactions with atmospheric water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
