Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Heavy-Duty Anti-Corrosion Epoxy Zinc Rich Primer for Steel Substrates
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is shot blasted or sand blasted to Sa2.5 level, or manually rust-removed to St3 level.
3.Construction conditions:
The substrate temperature must be 3°C higher than the dew point, relative humidity <85%, wind force ≤ level 3; when the substrate temperature is lower than 5°C, the epoxy resin and curing agent stop reacting and construction should be stopped. Avoid rainy, foggy, windy and sandy days and condensation in the morning and evening for outdoor construction.
4.Notes:
1. Before use, employ mechanical stirring to ensure component A is uniformly mixed, and subsequently blend it evenly with component B.
2. During the coating process, regular stirring is essential to prevent sedimentation, as an imbalance in the powder to liquid ratio can compromise the paint film quality.
3. For optimal results, it's recommended that the dry film thickness be maintained at ≥70μm, completing 1 to 2 coats.
4. After mixing, the two-component paint should generally be used within 5 hours to maintain coating quality.
5. After using the curing agent, seal it tightly and use it promptly to avoid losses due to reactions with airborne water vapor.
Discuss this product for your project
Include your application, required quantity and destination.
