Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 Heavy-Duty Epoxy Primer: Zinc-Rich Formulation for Steel Protection
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Steel Structure Anti-Corrosion Epoxy Zinc Rich Primer Paint
1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
Ensure the steel surface is meticulously shot blasted or sand blasted to an Sa2.5 level, or manually treated to an St3 level, ensuring pristine conditions for application.
3.Construction conditions:
Maintain substrate temperatures at least 3°C above the dew point, with a relative humidity lower than 85%, and wind force not exceeding level 3. If substrate temperature dips below 5°C, cease construction to prevent reaction cessation between epoxy resin and curing agent. Avoid operations on rainy, foggy, windy, or sandy days and be cautious of morning and evening condensation for outdoor setups.
4.Notes:
1. Initiate the process by thoroughly mixing component A using mechanical stirring before combining it evenly with component B.
2. Stir intermittently during the application to thwart sedimentation, maintaining the integrity of the powder to liquid ratio, critical for the paint film's quality.
3. Aim for a dry film thickness of at least 70μm, applying 1 to 2 coats to ensure optimal results.
4. The mixed two-component paint should ideally be utilized within a 5-hour window to preserve coating excellence.
5. After using the curing agent, securely seal it and use it promptly to prevent unwanted reactions with atmospheric moisture, safeguarding against material loss.
Discuss this product for your project
Include your application, required quantity and destination.
