Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Adhesion Matt Epoxy Primer Coating - Ideal for Challenging Surfaces
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously prepared through shot blasting or sand blasting to Sa2.5 level, ensuring it is meticulously cleaned of rust, or by manual rust removal to St3 level.
3.Construction conditions:
Optimal application conditions include a substrate temperature that surpasses the dew point by at least 3°C, with humidity maintained below 85%, and wind force at or below level 3. If temperatures fall below 5°C, postpone application, as the epoxy resin and curing agent halt reaction. Refrain from construction during rainy, foggy, windy, or sandy conditions, as well as during condensation periods in mornings and evenings for exterior applications.
4.Notes:
1. Prior to application, initiate mechanical stirring to ensure component A is uniformly mixed, then integrate thoroughly with component B.
2. Maintain consistent stirring throughout the application to avert sedimentation, which can lead to a disparity in the powder-to-liquid ratio, compromising the integrity of the paint film.
3. It is advised that a minimum dry film thickness of ≥70μm be achieved, with 1 to 2 coats completed for optimal protection.
4. The two-component paint should ideally be consumed within 5 hours post-mixing to maintain coating excellence. Extended time may degrade quality.
5. After the curing agent is opened, ensure it is securely sealed and utilized promptly to prevent potential losses from reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
