Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Adhesion Matt Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1. Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2. Surface treatment:
The steel surface is meticulously prepared by shot blasting or sand blasting to achieve Sa2.5 level, or through manual rust removal to reach St3 level for optimal results.
3. Construction conditions:
Ensure the substrate temperature exceeds the dew point by at least 3°C. Maintain relative humidity below 85%, and keep wind force at or below level 3. If substrate temperature falls below 5°C, the epoxy resin and curing agent cease reacting, necessitating a halt in construction. Avoid undertaking outdoor projects during rain, fog, strong winds, or sandstorms, and be wary of condensation during mornings and evenings.
4. Notes:
1. Prior to application, vigorously mix component A using mechanical stirring to uniformity, then blend thoroughly with component B.
2. Consistently stir throughout the coating process to avert sedimentation, as imbalance in the powder-to-liquid ratio can compromise the paint film's quality.
3. Aim for a dry film thickness of ≥70μm, with 1 to 2 coats recommended for optimal protection.
4. Use the mixed two-component paint within 5 hours to maintain superior coating integrity, as extending beyond this timeframe may degrade quality.
5. Ensure the curing agent is tightly sealed after use and consumed promptly to prevent unwanted reactions with atmospheric moisture, which can lead to material degradation and potential loss.
Discuss this product for your project
Include your application, required quantity and destination.
