Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Coverage Matt Epoxy Primer Coating
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface should be meticulously shot blasted or sand blasted to Sa2.5 grade or manually rust-removed to St3 grade for optimal preparation.
3.Construction conditions:
Ensure the substrate temperature is consistently 3°C above the dew point with a relative humidity below 85%, and wind force not exceeding level 3. Construction must cease when substrate temperatures drop below 5°C, as the epoxy resin and curing agent will not react efficiently. Avoid construction during inclement weather conditions such as rain, fog, strong winds, and sandstorms, as well as high condensation periods in the mornings and evenings for any outdoor projects.
4.Notes:
1. Initiate use by thoroughly mixing component A using mechanical stirring, followed by equally thorough mixing with component B.
2. Continuous stirring during the application process is crucial to prevent sedimentation, which might lead to an imbalanced powder to liquid ratio thus compromising the final paint film quality.
3. For best results, aim for a dry film thickness of at least 70μm, completing 1 to 2 coats accordingly.
4. Upon mixing, it's imperative that the two-component paint is utilized within a 5-hour window to maintain superior coating quality.
5. Once the curing agent is depleted, ensure the container is tightly sealed and use the remaining contents promptly to prevent adverse reactions with moisture in the air, which could lead to unnecessary losses.
Discuss this product for your project
Include your application, required quantity and destination.
