Enlarge image
Image 1 of 6
Model: FD-H001
FD-H001 High Gloss Finish Matt Epoxy Primer Coating - Ideal for Refinishing
FD-H001 two-component epoxy primer for steel substrates.
Reference price (FOB)
US $4-10 / kg
| Quantity | Reference price |
|---|---|
| 100-9,999 kg | USD 10.00 / kg |
| 10,000-999,999 kg | USD 8.00 / kg |
| 1,000,000+ kg | USD 4.00 / kg |
Minimum order: 100 kg
Confirm the specification, quantity and shipping terms for your quotation.
Request a QuoteProduct specifications
- Model NO.
- FD-H001
- Main Raw Material
- Epoxy
- Method
- Spray
- Level
- Primer
- Drying Method
- Air Drying
- Substrate
- Steel
- Components
- Film Forming Matter
- Formation Mechanism
- Conversion Type
- Luster
- Matt
- Weight
- 20kg/Barrel
- Construction Method
- High Pressure Airless Spray, Air Spray, Brush, Rol
- Coating Thickness
- Wet Film:80um Dry Film: 40um
- After Sales Service
- 5 Years
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Trademark
- signal
- Origin
- Dongying China
- HS Code
- 3208100000
- Production Capacity
- 50000ton/Year
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
- Lead Time
- 7 days (1 - 1000 kg) To be negotiated ( > 1000 kg)
- Number of components
- Two-component
- Color
- Grey
- Proportion
- About 2.40
- Dry Time
- 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days
- Mixing ratio
- 10:1
- Coating thickness
- Wet film:80um Dry film: 40um
- Construction methord
- High pressure airless spray, air spray, brush, roller
- Shelf life
- 12 months
Packaging & shipping
- Transport Package
- Barrel Package in Pallet
- Specification
- 35*30
- Package Size
- 30.00cm * 30.00cm * 35.00cm
- Package Gross Weight
- 20.000kg
Product description
Product Description
Product Name: Hot Sales High-Performance Anti Rust Zinc Epoxy Primer for Steel Buildings

1.Introduction:
| Number of components | Two-component |
| Color | Grey |
| Proportion | About 2.40 |
| Dry Time | 23±2°C Surface dry time ≤30min, Through dry time ≤24h, Fully cured 7 days |
| Mixing ratio | 10:1 |
| Coating thickness | Wet film:80um Dry film: 40um |
| Construction methord | High pressure airless spray, air spray, brush, roller |
| Shelf life | 12 months |
2.Surface treatment:
The steel surface is meticulously shot blasted or sand blasted to achieve a pristine Sa2.5 level, or rust is manually removed to a clean St3 level.
3.Construction conditions:
Ensure the substrate temperature remains at least 3°C above the dew point, with relative humidity under 85%, and wind force not exceeding level 3. If substrate temperature falls below 5°C, the epoxy resin and curing agent cease reacting, necessitating a halt in construction. Avoid embarking on projects during rainy, foggy, windy, or sandy days, and watch out for condensation during early morning and evening hours for outdoor tasks.
4.Notes:
1. Prior to use, employ mechanical stirring to thoroughly mix component A, then combine evenly with component B.
2. Stir regularly during application to prevent sedimentation, which may disrupt the powder-to-liquid ratio, potentially affecting the paint film's quality.
3. It is advisable to maintain a dry film thickness of at least 70μm, completing 1 to 2 coats for optimal performance.
4. After mixing, utilize the two-component paint within 5 hours to ensure the highest coating quality; exceeding this time frame may impair results.
5. Once the curing agent is used, seal it tightly and employ promptly to prevent any losses due to reactions with atmospheric moisture.
Discuss this product for your project
Include your application, required quantity and destination.
